Skip to main content
Loading…
This section is included in your selections.

A. Provide a continuous trail system throughout the master planned project, connecting it to the open space, adjacent projects, regional trails and bikeways serving the site such as the Jordan River. Sidewalks may be considered as trail linkages. Trails through open space areas shall be a minimum of eight feet wide unless the planning commission determines the specific situation warrants a lesser width.

B. Public access shall be provided to all open space, directly from the public street/sidewalk system or through off-street pedestrian and/or bicycle paths. Trailheads, including seating, trash receptacles, and associated parking, shall be provided as appropriate and necessary. (Ord. 2013-04 § 1 (Att. A (part)))