Skip to main content
Loading…
This section is included in your selections.

In order to reduce the risk of future groundwater contamination, the integrity of the cap will be maintained as provided in Section 8.10.060, no utilities will be located beneath the cap, and all surface water management (including storm water management during construction) will be in compliance with the SMP. (Ord. 6/26/2007O-8 § 1 (Exh. A (part)))