Skip to main content
Loading…
This section is included in your selections.

This section through Section 8.10.130 apply only to the Bingham Junction South property unless otherwise specifically provided. The Bingham Junction South property includes a surface cover underlain by a demarcation layer consisting either of slag material (minimum twenty-four inches) or a brightly colored geotextile material. It is presumed that materials located beneath the demarcation layer exceed the remediation goals established by the EPA for the property; however, this presumption may be rebutted as provided herein. (Ord. 6/26/2007O-8 § 1 (Exh. A (part)))